We’re proud to announce the successful signing of a contract for the implementation of the groundbreaking SORAL system (System for the Assessment of the Risk of Cable Line Failures) this June at Energa-Operator’s Olsztyn branch.
SORAL is part of an innovative research and development project conducted in collaboration with ENERGA-Operator.
The SORAL system is currently being launched at the Olsztyn branch, covering an impressive network of approximately 2,400 km of cable lines. With an expected completion date in mid-September 2023, the successful deployment of the system at this initial branch will pave the way for its future implementation in all branches of ENERGA-Operator.
About the SORAL system
Designed specifically to assess the technical condition and failure risk of medium-voltage cable lines, SORAL revolutionizes network maintenance practices. By providing crucial information on the condition of both individual lines and the entire organization, the system enables operators to adopt a proactive approach to maintenance rather than a reactive one.